DRUMHELLER & THE BADLANDS
Valley Times

The stories close to home.

Local Government / News · Drumheller, Alberta

Planned Highway 838 repairs are not the full bridge replacement

The September notice distinguishes near-term maintenance from a later replacement project.

A September 5 municipal notice describes planned maintenance on the Highway 838 bridge over Michichi Creek, including replacement of bridge girders. The bridge announcement attributes the work to Alberta Transportation and Economic Corridors. Its stated purpose is to address structural concerns and extend service until a future replacement; it does not announce completion of a new bridge.

The notice anticipated work beginning in September and completion by mid-October 2026, with roughly two weeks on site. Those remain the announcement's expectations. They are not a verified construction diary, and this report does not establish which lanes are open on a particular day.

Responsibility also differs from a neighbourhood road repair. The town's roads and streets information says highways and their associated traffic devices within municipal boundaries fall under Alberta Transportation. Its municipal street-improvement list is therefore not a substitute for a highway-project update.

For readers following the project, the useful distinction is between maintenance activity, traffic arrangements and a full replacement decision. Evidence of one should not be treated as proof that the other two have been settled.